{"id":35112,"date":"2017-09-08T12:52:56","date_gmt":"2017-09-08T12:52:56","guid":{"rendered":"http:\/\/vid.app.com.pk\/vid\/?p=35112"},"modified":"2017-09-08T13:08:51","modified_gmt":"2017-09-08T13:08:51","slug":"pm-inaugurates-340-mw-c-4-nuclear-power-plant-at-chashma","status":"publish","type":"post","link":"https:\/\/vid.app.com.pk\/vid\/2017\/09\/pm-inaugurates-340-mw-c-4-nuclear-power-plant-at-chashma\/","title":{"rendered":"PM inaugurates 340 MW C-4 nuclear power plant at Chashma"},"content":{"rendered":"<div style=\"width: 640px;\" class=\"wp-video\"><video class=\"wp-video-shortcode\" id=\"video-35112-1\" width=\"640\" height=\"480\" preload=\"metadata\" controls=\"controls\"><source type=\"video\/mp4\" src=\"http:\/\/vid.app.com.pk\/vid\/wp-content\/uploads\/2017\/09\/PM-inaugurates-340-MW-C-4-nuclear-power-plant-08-09-17.mp4?_=1\" \/><a href=\"http:\/\/vid.app.com.pk\/vid\/wp-content\/uploads\/2017\/09\/PM-inaugurates-340-MW-C-4-nuclear-power-plant-08-09-17.mp4\">http:\/\/vid.app.com.pk\/vid\/wp-content\/uploads\/2017\/09\/PM-inaugurates-340-MW-C-4-nuclear-power-plant-08-09-17.mp4<\/a><\/video><\/div>\n<p>CHASHMA,(Mianwali) 8 Sept (APP): Prime Minister Shahid<br \/>\nKhaqan Abbasi Friday inaugurated Pakistan\u2019s fifth nuclear power<br \/>\nplant C-4 here with a capacity of generating 340MW of power.<br \/>\nThe Pakistan Atomic Energy Commission (PAEC) is pursuing<br \/>\nits vision of nuclear technology for peaceful purposes and<br \/>\nachieved another milestone with the operation of Chashma<br \/>\nNuclear Power Plant Unit-4 (C-4).<br \/>\nThe plant would be operational on trial basis and would<br \/>\npass through various functional and safety related tests at<br \/>\nfull power.<br \/>\nChina Zhongyuan Engineering Company (CZEC) and PAEC<br \/>\npersonnel performed the commissioning and initial start-up<br \/>\nof the plant to full power after which acceptance tests<br \/>\nwere performed.<br \/>\nWith tremendous efforts of PAEC and Chinese friends, the<br \/>\nC-4 would become operational and connected to the country\u2019s<br \/>\npower grid.<br \/>\nThe Chashma nuclear power projects units, C-1, C-2 and<br \/>\nC-3 have been successfully contributing to the national grid<br \/>\nwith an excellent performance since 2000, 2011 and 2016<br \/>\nrespectively.<br \/>\nThe three nuclear power plants of Chinese origin are the<br \/>\nbest performing power stations in the country, supplying over<br \/>\n950 MW to the national grid with availability factors of around<br \/>\n99 percent.<br \/>\nCurrently, country\u2019s four nuclear power plants KANUPP,<br \/>\nC-1, C-2 and C-3 are operational and generating a total of<br \/>\n1,030 MW of power whereas with the inauguration of C-4 Chashma<br \/>\nplant, the power supply would be further enhanced.<br \/>\nTwo large sized nuclear power plants, K-2 and K-3 are<br \/>\nunder construction near Karachi and are scheduled to be<br \/>\noperational in 2020 and 2021 respectively, adding another<br \/>\n2,200 MW to the national grid.<\/p>\n<p>&nbsp;<\/p>\n<p>APP\/Zaheer<\/p>\n","protected":false},"excerpt":{"rendered":"<p>CHASHMA,(Mianwali) 8 Sept (APP): Prime Minister Shahid Khaqan Abbasi Friday inaugurated Pakistan\u2019s fifth nuclear power plant C-4 here with a capacity of generating 340MW of power. The Pakistan Atomic Energy Commission (PAEC) is pursuing its vision of nuclear technology for peaceful purposes and achieved another milestone with the operation of Chashma Nuclear Power Plant Unit-4 [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":35117,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"video","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":{"0":"post-35112","1":"post","2":"type-post","3":"status-publish","4":"format-video","5":"has-post-thumbnail","7":"category-national","8":"post_format-post-format-video"},"video_url":["http:\/\/vid.app.com.pk\/vid\/wp-content\/uploads\/2017\/09\/PM-inaugurates-340-MW-C-4-nuclear-power-plant-08-09-17.mp4"],"featured_media_src_url":"https:\/\/vid.app.com.pk\/vid\/wp-content\/uploads\/2017\/09\/1-33.jpg","_links":{"self":[{"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/posts\/35112","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/comments?post=35112"}],"version-history":[{"count":3,"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/posts\/35112\/revisions"}],"predecessor-version":[{"id":35129,"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/posts\/35112\/revisions\/35129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/media\/35117"}],"wp:attachment":[{"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/media?parent=35112"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/categories?post=35112"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vid.app.com.pk\/vid\/wp-json\/wp\/v2\/tags?post=35112"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}